Monday, April 30, 2012

Trebuchet Building Competition!


APRIL: Trebuchet Build-Off!
Needless to say, this was an incredibly manly competition! Holy crap it was great. The men headed up to the cabine for a day of building and hurling rocks. 

EVENT DESCRIPTION:
- 3.5 hour build time.
- Every man gets 1 x12 inch metal rod, access to nails, a tape, a hammer and a drill, string and a piece of burlap
- Every man gets a few specific pieces of wood. (1 1x6x8 feet , 4 2x4x8)
- Every man gets access to a ramp to shoot.





Not the greatest idea of the day. 

loading the treb!

The boys hard at work.

RESULTS:

No comments:

Post a Comment